underwater site

FPA Issues New JCoP to Prevent Escape of Water on Construction Sites

The FPA have published a new joint code of practise for managing the escape of water (EoW) on construction sites for temporary water systems within buildings. 

Called Joint Code of Practice (JCoP) for Escape of Water Prevention and Management on Construction Sites, the JCoP covers the following for the supply chain and contractors during the construction phase, in order to mitigate losses and project delays:

  • Hot and cold plumbing systems
  • Mains water
  • Waste/effluent
  • Sprinkler systems
  • Mechanical systems
  • Associated water storage tanks

The JCoP has been produced by RISCAuthority and the Construction Insurance Risk Engineers Group (CIREG), published by the FPA, and endorsed by the London Engineering Group (LEG) and the Chartered Institute of Plumbing and Heating Engineering (CIPHE).

Further Reading

Facebook
Twitter
LinkedIn
Email
Print

This Photo by Unknown Author is licensed under CC BY-SA