BS 5975: 2019
Purchase your copy of CHSG's Summary of BS 5975:
2019 Code of Practice for Temporary Works Procedures
The Construction Health and Safety Group is proud to announce that we have produced a A6 booklet to summarise the new BS 5975: 2019 Code of Practice for Temporary Works Procedures.
The contents has been designed to provide greater clarity, with respect to procedures for a wide range of acquisitions and contractual agreements.
The document also covers a wide range of organisations that should have temporary works policies and persons identified as responsible; (6.1.1.2).
- Clients
- Management contractors
- Contractors
- Sub contractors
- Utility authorities
- Service suppliers
- Equipment manufacturers/suppliers
- Specialist contractors
- Designers
In-line with CDM 2015, the standard also identifies, in greater depth, the roles and responsibilities and such positions as PC, PD, DI etc.