BS 5975

The new updated two-part British Standard for Temporary Works procedures (BS 5975:2024) is here – and it’s a game-changer for anyone working in construction.

The Construction Health and Safety Group are proud to announce that we have produced a new Summary of BS 5975-1:2024 and BS 5975-2:2024, the code of practice for temporary works.

Perfect for construction managers, engineers, and anyone involved in temporary works design, coordination, and site safety, this PDF explains the key updates and requirements into a straightforward, accessible format.

Whether you are brushing up on the latest standards or need a reliable resource for day-to-day work, this PDF ensures you and your team are aligned with current best practice.

The guide includes:

  • Essential principles from both Part 1 (Code of Practice for Temporary Works Procedures) and Part 2 (Design, Erection & Dismantling of Falsework).
  • Highlights critical updates from the 2024 revision.
  • Saves you time by cutting through jargon with a clear, structured summary.
  • Ideal as a quick reference guide for training, toolbox talks, or project planning.

Purchase a digital PDF version of Summary of BS 5975-1:2024 and BS 5975-2:2024.

For all non-members, once payment has been received you’ll receive an email with a link you can click on to download your booklet. If you are a member, you can simply login to your account, navigate to downloads and access your PDF.

Remember you’ll only have access to one download per purchase.